Drawings are scale renderings of relations among soils, artifacts, features, and architecture revealed in excavations or as seen on modern ground surface. The primary kinds of drawings found in the collection are:
Sections: Depictions of cuts made through buildings or series of earth layers during excavations that show the horizontal and vertical relations among strata, constructions, and features. These are usually drawn at a scale of 1cm:20cm.
Elevations: Face-on renderings of architectural elements, primarily walls, showing the horizontal and vertical relations among their components, usually rocks. These are drawn at scales of 1cm:10cm and 1cm:20cm; check the drawings to see what scale is used in each case.
Excavation Plans: Top-down views of architectural elements revealed in excavations in which the constructions are depicted schematically, i.e., as lines. These drawings demonstrate the horizontal relations among constructions and features. They are drawn at a scale of 1cm:100cm. These are also called Excavation Maps.
Detailed Architectural Plans: Top-down views of architectural elements exposed in excavations, showing the horizontal relations among individual rocks comprising distinct construction units. They are drawn at a scale of 1cm:10cm.
Detailed Feature Plans: Top-down views of relations among materials revealed in excavations, drawn at a scale of 1cm:10cm. They are frequently depictions of burials and in situ artifact scatters.
Site Maps: Top-down renderings showing the horizontal relations among buildings and features at a site as these appeared on ground surface, that is, without excavations. Maps are drawn at scales of 1cm:1000cm or 1cm:500cm; check the drawing to determine which scale was used in each case. Site maps were not modified to include elements revealed during excavations.
Sketch Plans: These are not drawn to scale but are intended to show relations among such elements as architectural features, Suboperations, and excavation units and lots. A particular subset of this genre is the Excavation Unit Plan that shows the horizontal relations among the (usually) 1m2 pits that comprise the Suboperations dug at a particular locale.
Drawings
PVC-DRW-El Coyote-Op 53AB, AD-Str 373-Section-Inked, Patricia Urban
PVC-DRW-El Coyote-Op 53AC-Str 405-Section, Laura Richardson
PVC-DRW-El Coyote-Op 53AG-Str 373-Section, Patricia Urban
PVC-DRW-El Coyote-Op 53AH, AI-Str 378-Section, Claire Novotny
PVC-DRW-El coyote-Op 53AJ, AK-Str 378-Section, Claire Novotny
PVC-DRW-El Coyote-Op 53AJ-Str 378-Section, Claire Novotny
PVC-DRW-El Coyote-Op 53AL, AQ, AR, AT, AV, AY, BG, BQ, BV, BW- Str 376-Detailed Excavation Plan, David Aguilar
PVC-DRW-El Coyote-Op 53AL, AQ, AR, AT, AV, AY, BG, BQ, BV, BW-Str 376-Excavation Unit Plan, Laura Richardson
PVC-DRW-El Coyote-Op 53AL-Str 376-Section, Laura Richardson
PVC-DRW-El Coyote-Op 53AM-Str 373-Section, Claire Novotny
PVC-DRW-El Coyote-Op 53AN-Test Pit-Section, Laura Richardson
PVC-DRW-El Coyote-Op 53AP-Str 372-Feature Plan, Laura Richardson
PVC-DRW-El Coyote-Op 53AP-Str 372-Section, Laura Richardson
PVC-DRW-El Coyote-Op 53AP-Str 372-Section, Patricia Urban
PVC-DRW-El Coyote-Op 53A)-Str 372-Section, Laura Richardson
PVC-DRW-El Coyote-Op 53BA, BB, BN, BT-Str 407-Excavation Unit Plan, Claire Novotny
PVC-DRW-El Coyote-Op 53BA, BB-Str 407-Section, Claire Novotny
PVC-DRW-El Coyote-Op 53BA, BB-Str 407-Section-Inked, Patricia Urban
PVC-DRW-El Coyote-Op53BD, BE, BK, BM-Str 371-Excavation Unit Plan, Claire Novotny
PVC-DRW-El Coyote-Op 53BD, BE, BK, BM-Str 371-Section, Claire Novotny
PVC-DRW-El Coyote-Op 53B-Str 378-Section, Meghan Kerley
PVC-DRW-El Coyote-Op 53CA, CI, CN-Str 373 and Test Pits-Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 53CA-CQ, CS, 54CA-CR-Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 53CA-CQ, CS, Op 54CA-CR-Excavation Plan-Test Pits, Edward Schortman
PVC-DRW-El Coyote-Op 53CA-Str 373-Feature Plan, Edward Schortman
PVC-DRW-El Coyote-Op 53CA-Str 373-Feature Plan, Edward Schortman
PVC-DRW-El Coyote-Op 53CA-Str 373-Feature Plan, Edward Schortman
PVC-DRW-El Coyote-Op 53CA-Str 373-Feature Plan, Edward Schortman
PVC-DRW-El Coyote-Op 53CA-Str 373-Section, Edward Schortman
PVC-DRW-El Coyote-Op 53CA-Str 373-Section, Edward Schortman
PVC-DRW-El Coyote-Op 53CA-Str 373-Section, Edward Schortman
PVC-DRW-El Coyote-Op 53CA-Str 373-Section, Patricia Urban
PVC-DRW-El Coyote-Op 53CA-Str 373-Section, Patricia Urban
PVC-DRW-El Coyote-Op 53CA-Str 373-Section, Patricia Urban
PVC-DRW-El Coyote-Op 53CA-Str 373-Section, Patricia Urban
PVC-DRW-El Coyote-Op 53CB-Str 417-Section, Edward Schortman
PVC-DRW-El Coyote-Op 53CC, CM, 54CA-Str365, 368, 369-Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 53CC, CM-Str 368, 369-Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 53CC-Str 368-Section, Edward Schortman
PVC-DRW-El Coyote-Op 53CD-Test Pit-Section, Edward Schortman
PVC-DRW-El Coyote-Op 53CE-Test Pit-Section, Edward Schortman
PVC-DRW-El Coyote-Op 53CF, CH, Test Pits-Sections, Edward Schortman
PVC-DRW-El Coyote-Op 53CG-Test Pit-Section, Edward Schortman
PVC-DRW-El Coyote-Op 53CI, CK-Test Pits-Sections, Edward Schortman
PVC-DRW-El Coyote-Op 53CJ-Test Pit-Section, Edward Schortman
PVC-DRW-El Coyote-Op 53CL-Test Pit-Section, Patricia Urban
PVC-DRW-El Coyote-Op 53CM-Str 368-Detailed Excavation Plan, Patricia Urban
PVC-DRW-El Coyote-Op 53CM-Str 368-Section, Patricia Urban
PVC-DRW-El Coyote-Op 53CN-Test Pit-Section, Edward Schortman
PVC-DRW-El Coyote-Op 53CO-Test Pit-Section, Patricia Urban
PVC-DRW-El Coyote-Op 53CP, CQ,-Test Pits-Sections, Patricia Urban
PVC-DRW-El Coyote-Op 53C-Str 371-Section, Georlin Thorne
PVC-DRW-El Coyote-Op 53D, E-Test Pits-Sections, Georlin Thorne
PVC-DRW-El Coyote-Op 53F-Str 373-Section, Meghan Kerley
PVC-DRW-El Coyote-Op 53-Site Map, Edward Schortman
PVC-DRW-El Coyote-Op 53-Str 372-Detailed Architectural Plan, David Aguilar
PVC-DRW-El Coyote-Op 53-Str 372-Excavation Unit Plan, Laura Richardson
PVC-DRW-El Coyote-Op 53-Str 372-Sketch Excavation Plan, Laura Richardson
PVC-DRW-El Coyote-Op 53-Str 372-Sketch Excavation Plan, Laura Richardson
PVC-DRW-El Coyote-Op 53-Strs 371, 372, 376, 378, 405, 407-Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 53-Test Pits-Sections, Patricia Urban
PVC-DRW-El Coyote-Op 53-Test Pits-sections, Patricia Urban
PVC-DRW-El Coyote-Op 53-Test Pits-Sections, Patricia Urban
PVC-DRW-El Coyote-Op 54AB, AC-Str 366-Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 54AB, AC-Str 366-Excavation Unit Plan, Claire Novotny
PVC-DRW-El Coyote-Op 54AC-Str 366-Section, Claire Novotny
PVC-DRW-El Coyote-Op 54AD-Str 369-Section, Claire Novotny
PVC-DRW-El Coyote-Op 54CA-Str 365-Section, Patricia Urban
PVC-DRW-El Coyote-Op 54CB, CC, CD-Str 379-Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 54CB-Test Pit-Section, Patricia Urban
PVC-DRW-El Coyote-Op 54CC-Str 379-Section, Patricia Urban
PVC-DRW-El Coyote-Op 54CD-Str 379-Section, Patricia Urban
PVC-DRW-El Coyote-Op 54CE-Str 379-Section, Patricia Urban
PVC-DRW-El Coyote-Op 54CF, CG, CH, CI, CJ, CK, CL, CM-Str 411-Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 54CF, CJ-Str 411-Section, Patricia Urban
PVC-DRW-El Coyote-Op 54CG, CH, CI-Str 411-Section, Patricia Urban
PVC-DRW-El Coyote-Op 54CM-Test Pit-Section, Patricia Urban
PVC-DRW-El Coyote-Op 54CO, CP, CQ-Test Pits-Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 54CO, CP-Test Pit-Section, Patricia Urban
PVC-DRW-El Coyote-Op 54CP-Test Pit-Section, Patricia Urban
PVC-DRW-El Coyote-Op 54CP-Test Pit-Section, Patricia Urban
PVC-DRW-El Coyote-Op 54CQ-Test Pit-Section, Patricia Urban
PVC-DRW-El Coyote-Op 54CR-Test Pit-Section, Patricia Urban
PVC-DRW-El Coyote-Op 54CR-Test Pit-Section, Patricia Urban
PVC-DRW-El Coyote-Op 54CS-Test Pit-Section, Patricia Urban
PVC-DRW-El Coyote-Op 54-Test Pits-Sections, Patricia Urban
PVC-DRW-El Coyote-Op 54-Test Pits-Sections, Patricia Urban
PVC-DRW-El Coyote-Op 54-Test Pits-Sections, Patricia Urban
PVC-DRW-El Coyote-Op 54-Test Pits-Sections, Patricia Urban
PVC-DRW-El Coyote-Op 54-Test Pits-Sections, Patricia Urban
PVC-DRW-El Coyote-Op 5A-Str 261-Section, Edward Schortman
PVC-DRW-El Coyote-Op 5A-Str 261-Section, Edward Schortman
PVC-DRW-El Coyote-Op 5B, C, F, H, J, L-Str 24-Excavation Unit Plan, Imogen Gunn
PVC-DRW-El Coyote-Op 5B, C-Str 24-Section, Edward Schortman
PVC-DRW-El Coyote-Op 5B, C-Str 24-Section, Edward Schortman
PVC-DRW-El Coyote-Op 5D, I K, M, N-Sketch Excavation Plan, Jennifer Wendt
PVC-DRW-El Coyote-Op 5D, I, K, M, N-Str 61-Sketch Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 5D, I, K-Str 61-Sketch Excavation Plan, Jennifer Wendt
PVC-DRW-El Coyote-Op 5G/011-Detailed Burial Plan, Edward Schortman
PVC-DRW-El Coyote-Op 5H/009-Str 24-Detailed Excavation Plan, Imogen Gunn