Drawings are scale renderings of relations among soils, artifacts, features, and architecture revealed in excavations or as seen on modern ground surface. The primary kinds of drawings found in the collection are:
Sections: Depictions of cuts made through buildings or series of earth layers during excavations that show the horizontal and vertical relations among strata, constructions, and features. These are usually drawn at a scale of 1cm:20cm.
Elevations: Face-on renderings of architectural elements, primarily walls, showing the horizontal and vertical relations among their components, usually rocks. These are drawn at scales of 1cm:10cm and 1cm:20cm; check the drawings to see what scale is used in each case.
Excavation Plans: Top-down views of architectural elements revealed in excavations in which the constructions are depicted schematically, i.e., as lines. These drawings demonstrate the horizontal relations among constructions and features. They are drawn at a scale of 1cm:100cm. These are also called Excavation Maps.
Detailed Architectural Plans: Top-down views of architectural elements exposed in excavations, showing the horizontal relations among individual rocks comprising distinct construction units. They are drawn at a scale of 1cm:10cm.
Detailed Feature Plans: Top-down views of relations among materials revealed in excavations, drawn at a scale of 1cm:10cm. They are frequently depictions of burials and in situ artifact scatters.
Site Maps: Top-down renderings showing the horizontal relations among buildings and features at a site as these appeared on ground surface, that is, without excavations. Maps are drawn at scales of 1cm:1000cm or 1cm:500cm; check the drawing to determine which scale was used in each case. Site maps were not modified to include elements revealed during excavations.
Sketch Plans: These are not drawn to scale but are intended to show relations among such elements as architectural features, Suboperations, and excavation units and lots. A particular subset of this genre is the Excavation Unit Plan that shows the horizontal relations among the (usually) 1m2 pits that comprise the Suboperations dug at a particular locale.
Drawings
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Sections, Christian Wells
PVC-DRW-El Coyote-Op 25A-Test Pit-Excavation Plan, Christian Wells
PVC-DRW-El Coyote-Op 25A-Test Pit-Section, Christian Wells
PVC-DRW-El Coyote-Op 26A, B-Str 138-Excavation Plan, Christian Wells
PVC-DRW-El Coyote-Op 26A-Test Pits-Excavation Plan, Christian Wells
PVC-DRW-El Coyote-Op 26A-Test Pits-Section, Christian Wells
PVC-DRW-El Coyote-Op 26B Op 28A-Test Pits-Section, Christian Wells
PVC=DRW-El Coyote-Op 26B-Str 138-Burial Plan, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 138-Burial Plan, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 138-Burial Plan, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 138-Burial Plan, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 138-Burial Plan, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 138-Burial Plan, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 138-Burial Plan, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 138-Burial Plan, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 138-Elevation, Christian Wells
PVC-DRW-El Coyote-Op 26 B-Str 138-Excavation Plan, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 138-Section, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 138-Section, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 138-Section, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 238-Section, Christian Wells
PVC-DRW-El Coyote-Op 26B-Test Pits-Section, Christian Wells
PVC-DRW-El Coyote-Op 29A, B, C, D-Strs 161 and 163-Excavation Plan, William McFarlane
PVC-DRW-El Coyote-Op 29A, B, D-Str 163-Section, William McFarlane
PVC-DRW-El Coyote-Op 29AB-Str 156-Section, Georlin Thorne
PVC-DRW-El Coyote-Op 29AC-Str 165-Section, Patricia Urban
PVC-DRW-El Coyote-Op 29CB, CC, CD, CE, CF, CG, CH-Str 151-Excavation Unit Plan, Rebecca Laughner
PVC-DRW-El Coyote-Op 29CB-Str 151-Section, Rebecca Laughner
PVC-DRW-El Coyote-Op 29CB-Str 151-Section-Traced, Rebecca Laughner
PVC-DRW-El Coyote-Op 29CI, CJ, CK, Str 159-Excavation Unit Plan, Rebecca Laughner
PVC-DRW-El Coyote-Op 29CI-Str 159-Section, Rebecca Laughner
PVC-DRW-El Coyote-Op 29C-Str 161-Section, William McFarlane
PVC-DRW-El Coyote-Op 29-Str 151-Section, Rebecca Laughner
PVC-DRW-El Coyote-Op 29-Str 151-Section-Traced, Rebecca Laughner
PVC-DRW-El Coyote-Op 29-Str 151-Sketch Plan, Rebecca Laughner
PVC-DRW-El Coyote-Op 29-Str 151-Sketch Plan, Rebecca Laughner
PVC-DRW-El Coyote-Op 29-Str 156-Detailed Excavation Plan, Patricia Urban
PVC-DRW-El Coyote-Op 29-Str 156-Section, Georlin Thorne
PVC-DRW-El Coyote-Op 29-Str 159-Section, Rebecca Laughner
PVC-DRW-El Coyote-Op 29-Str 165-Section, Patricia Urban
PVC-DRW-El Coyote-Op 31A, B-Str 173-Section, Adam Taplin
PVC-DRW-El Coyote-Op 31G, H, Str 174-Section, Adam Taplin
PVC-DRW-El Coyote-Op 31-Strs 173, 174-excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 36AA, AB, AC, AD, AE-Platform-Detailed Excavation Plan, Leigh Anne Ellison
PVC-DRW-El Coyote-Op 36AA-Platform-Section, Leigh Anne Ellison
PVC-DRW-El Coyote-Op 36A, B, C, D-Str 223 and 224-Section, William McFarlane
PVC-DRW-El Coyote-Op 36A, B, C, D-Str 223 and 224-Section, William McFarlane
PVC-DRW-El Coyote-Op 36A, B, C, D-Str 223 and 224-Section, William McFarlane
PVC-DRW-El Coyote-Op 36A, B, C, D-Str 223 and 224-Section, William McFarlane
PVC-DRW-El Coyote-Op 36A, B, C, D-Str 223 and 224-Section, William McFarlane
PVC-DRW-El Coyote-Op 36A, B-Str 224-Excavation Plan, William McFarlane
PVC-DRW-El Coyote-Op 36A-Str 224-Feature Plan, William McFarlane
PVC-DRW-El Coyote-Op 36A-Str 224-Feature Plan, William McFarlane
PVC-DRW-El Coyote-Op 36C-Str 223-Excavation Plan, William McFarlane
PVC-DRW-El Coyote-Op 36E-Str 224-Section, William McFarlane
PVC-DRW-El Coyote-Op 36E-Str 224-Section, William McFarlane
PVC-DRW-El Coyote-Op 37, 39, Strs 218, 220-Sections, William McFarlane
PVC-DRW-El Coyote-Op 37A-Strs 220-Section, William McFarlane
PVC-DRW-El Coyote-Op37B, E-Str 204-Section, Patricia Urban
PVC-DRW-El Coyote-Op37C-Str 204-Section, Patricia Urban
PVC-DRW-El Coyote-Op 37D, H, I, J-Str 247-Section, Alexander Matlack
PVC-DRW-El Coyote-Op37D, H, I, J-Str 247-Section, Patricia Urban
PVC-DRW-El Coyote-Op 37I-Str 220-Section, William McFarlane
PVC-DRW-El Coyote-Op 37J-Str 220-Section, William McFarlane
PVC-DRW-El Coyote-Op 37K-Str 232-Section, Brandon Liverence
PVC-DRW-El Coyote-Op 37L-Str 232-Section, Brandon Liverence
PVC-DRW-El Coyote-Op 37L-Str 232-Section, Brandon Liverence
PVC-DRW-El Coyote-Op 37-Str 220-Detailed Excavation Plan, William McFarlane
PVC-DRW-El Coyote-Op 37-Str 220-Elevation, William McFarlane
PVC-DRW-El Coyote-Op 37-Str 220-Elevation, William McFarlane
PVC-DRW-El Coyote-Op 37-Str 220-Elevation, William McFarlane
PVC-DRW-El Coyote-Op 37-Str 220-Section, William McFarlane
PVC-DRW-El Coyote-Op 37-Str 220-Section, William McFarlane
PVC-DRW-El Coyote-Op 37-Str 220-Section, William McFarlane
PVC-DRW-El Coyote-Op 37-Str 220-Section, William McFarlane
PVC-DRW-El Coyote-Op 37-Str 220-Section, William McFarlane
PVC-DRW-El Coyote-Op 37-Str 220-Section, William McFarlane
PVC-DRW-El Coyote-Op 37-Str 247-Sketch Plan, Alexander Matlack
PVC-DRW-El Coyote-Op 39A, B-Str 218-Section, William McFarlane
PVC-DRW-El Coyote-Op 39A, B-Str 218-Section, William McFarlane
PVC-DRW-El Coyote-Op 39A, B-Str 218-Section, William McFarlane
PVC-DRW-El Coyote-Op 39A, B-Str 218-Section, William McFarlane
PVC-DRW-El Coyote-Op 39A, B, Str 218-Section, William McFarlane
PVC-DRW-El Coyote-Op 39E, F-Str 213-Section, Adam Taplin
PVC-DRW-El Coyote-Op 39E, F-Str 213-Section, Adam Taplin
PVC-DRW-El Coyote-Op 39G, H-Str 222-Section, Edward Schortman
PVC-DRW-El Coyote-Op 39 Str 213, 221, 222, 282, Op 41 Str 209, 210, 212-Excavation Map, Edward Schortman
PVC-DRW-El Coyote-Op 39-Str 218-Detailed Feature Plan, William McFarlane
PVC-DRW-El Coyote-Op 39-Str 218-Detailed Feature Plan, William McFarlane
PVC-DRW-El Coyote-Op 39-Str 221-Detailed Excavation Plan, David Aguilar
PVC-DRW-El Coyote-Op 39-Str 221-Section, Brandon Liverence
PVC-DRW-El Coyote-Op 39-Str 221-Section, Brandon Liverence
PVC-DRW-El Coyote-Op 39-Str 222-Detailed Excavation Plan, David Aguilar
PVC-DRW-El Coyote-Op 39-Str 282-Detailed Excavation Plan, William McFarlane
PVC-DRW-El Coyote-Op 39-Str 282-Section, Brandon Liverence
PVC-DRW-El Coyote-Op 3B-Str 5-Section, Edward Schortman
PVC-DRW-El Coyote-OP 3C-Str 8-Section, Edward Schortman