Drawings are scale renderings of relations among soils, artifacts, features, and architecture revealed in excavations or as seen on modern ground surface. The primary kinds of drawings found in the collection are:
Sections: Depictions of cuts made through buildings or series of earth layers during excavations that show the horizontal and vertical relations among strata, constructions, and features. These are usually drawn at a scale of 1cm:20cm.
Elevations: Face-on renderings of architectural elements, primarily walls, showing the horizontal and vertical relations among their components, usually rocks. These are drawn at scales of 1cm:10cm and 1cm:20cm; check the drawings to see what scale is used in each case.
Excavation Plans: Top-down views of architectural elements revealed in excavations in which the constructions are depicted schematically, i.e., as lines. These drawings demonstrate the horizontal relations among constructions and features. They are drawn at a scale of 1cm:100cm. These are also called Excavation Maps.
Detailed Architectural Plans: Top-down views of architectural elements exposed in excavations, showing the horizontal relations among individual rocks comprising distinct construction units. They are drawn at a scale of 1cm:10cm.
Detailed Feature Plans: Top-down views of relations among materials revealed in excavations, drawn at a scale of 1cm:10cm. They are frequently depictions of burials and in situ artifact scatters.
Site Maps: Top-down renderings showing the horizontal relations among buildings and features at a site as these appeared on ground surface, that is, without excavations. Maps are drawn at scales of 1cm:1000cm or 1cm:500cm; check the drawing to determine which scale was used in each case. Site maps were not modified to include elements revealed during excavations.
Sketch Plans: These are not drawn to scale but are intended to show relations among such elements as architectural features, Suboperations, and excavation units and lots. A particular subset of this genre is the Excavation Unit Plan that shows the horizontal relations among the (usually) 1m2 pits that comprise the Suboperations dug at a particular locale.
Drawings
PVC-DRW-El Coyote-Op3 D-Str 4-Section, Edward Schortman
PVC-DRW-El Coyote- Op 3-Str 5-Excavation Units Plan, Christopher Monson
PVC-DRW-El Coyote-Op 40A, B-Str 208-Elevation, Meghan Kerley
PVC-DRW-El Coyote-Op 40A, B-Str 208-Section, Meghan Kerley
PVC-DRW-El Coyote-Op 40C-Str 217-Section, Meghan Kerley
PVC-DRW-El Coyote-Op 40I-Str 208-Feature Plan, Meghan Kerley
PVC-DRW-El Coyote-Op 40-Str 208-Section, Meghan Kerley
PVC-DRW-El Coyote-Op 41AF, AG-Str 211-Section, Leigh Anne Ellison
PVC-DRW-El Coyote-Op 41AF, AG-Str 211-Section, Leigh Anne Ellison
PVC-DRW-El Coyote-Op 41B-Str 209-Section, Leigh Anne Ellison
PVC-DRW-El Coyote-Op 41B-Str 209-section, Edward Schortman
PVC-DRW-El Coyote-Op 41-Free-Standing Wall-Detailed Excavation Plan, Leigh Anne Ellison
PVC-DRW-El Coyote-Op 41-Free-Standing Wall-Detailed Excavation Plan, Leigh Anne Ellison
PVC-DRW-El Coyote-Op 41O, P-Str 210-Section, Leigh Anne Ellison
PVC-DRW-El Coyote-Op 41R, S-Str 212-Section, Adam Taplin
PVC-DRW-El Coyote-Op 41R, S-Str 212-Section, Adam Taplin
PVC-DRW-El Coyote-Op 41-Str 209-Detailed Excavation Plan, Leigh Anne Ellison
PVC-DRW-El Coyote-Op 41-Str 210-Detailed Excavation Plan, Leigh Anne Ellison
PVC-DRW-El Coyote-Op 41-Str 211-Detailed Excavation Plan, Leigh Anne Ellison
PVC-DRW-El Coyote-Op 41-Str 212-Detailed Excavation Plan, Adam Taplin
PVC-DRW-El Coyote-Op 41-Str 212-Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 44A-Str 242-Section, William McFarlane
PVC-DRW-El Coyote-Op 45A-Str 235-Section, Brandon Liverence
PVC-DRW-El Coyote-Op 45B-Str 235-Section, Brandon Liverence
PVC-DRW-El Coyote-Op 45C-Str 235-Section, Brandon Liverence
PVC-DRW-El Coyote-Op 4 5-Str 58, 59, 61, 261-Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 47B, C, G, H, I, J, K, M, P, Q, R, T, U, V, W-Str 85-Excavation Unit Plan, Patrick Dresch
PVC-DRW-El Coyote-Op 47B-Str 85-Section, Edward Schortman
PVC-DRW-El Coyote-Op 47C-Str 85/86-Section, Patrick Dresch
PVC-DRW-El Coyote-Op 47C-Str 85-Section, Edward Schortman
PVC-DRW-El Coyote-Op 47C-Str 86-Section, Edward Schortman
PVC-DRW-El Coyote-Op 47D, E, F, L, N, O-Str 81-Excavation Unit Plan, Alison Miner
PVC-DRW-El Coyote-Op 47D-Str 81-Section, Edward Schortman
PVC-DRW-El Coyote-Op 47D-Str 81-Section, Edward Schortman
PVC-DRW-El Coyote-Op 47G-Str 86-Section, Edward Schortman
PVC-DRW-El Coyote-Op 47H-Str 85/86-Section, Patrick Dresch
PVC-DRW-El Coyote-Op 47H-Str 86-Section, Edward Schortman
PVC-DRW-El Coyote-Op 47L-Str 81-Section, Alison Miner
PVC-DRW-El Coyote-Op 47L-Str 81-Section, Alison Miner
PVC-DRW-El Coyote-Op 47-Str 81, 85-Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 47-Str 81D, E, F, L, N, O-Excavation Unit Plan, Alison Miner
PVC-DRW-El Coyote-Op 47-Str 81-Section, Edward Schortman
PVC-DRW-El Coyote-Op 47-Str 81-Section, Edward Schortman
PVC-DRW-El Coyote-Op 47-Str 84, 85-86-Excavation Unit Plan, Patrick Dresch
PVC-DRW-El Coyote-Op 47-Strs 81, 84, 85, 86-Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 4A, E-Str 58-Section, Richard Woodbridge
PVC-DRW-El Coyote-Op 4A, E, Str 58-Sketch Plan, Richard Woodbridge
PVC-DRW-El Coyote-Op4A, E, Str 58-Sketch Plan with Transit Points, Edward Schortman
PVC-DRW-El Coyote-Op 4A-Str. 58-Section, Edward Schortman
PVC-DRW-El Coyote-Op 4C, D, F, G-Sketch Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 4C, D, F, G-Str 59-Excavation Unit Plan, Alicia Ebbitt
PVC-DRW-El Coyote-Op 4C, D-Str 59-Section, Edward Schortman
PVC-DRW-El Coyote-Op 4C, D-Str 59-Section, Edward Schortman
PVC-DRW-El Coyote-Op 4D-Str 59-Sketch Detailed Excavation Plan, Alicia Ebbitt
PVC-DRW-El Coyote-Op 4-Str 58-Excavation Unit Plan, Richard Woodbridge
PVC-DRW-El Coyote-OP 50, 53, 54-General Map of the Copper Workshop, Edward Schortman
PVC-DRW-El Coyote-Op 50A, B, K, N, V, X-Str 106-Excavation Unit Plan, Georlin Thorne
PVC-DRW-El Coyote-Op 50A-Str 106-Section, Patricia Urban
PVC-DRW-El Coyote-Op 50A-Str 106-Section, Patricia Urban
PVC-DRW-El Coyote-Op 50B-Str 106-Excavation Sketch Plain, Georlin Thorne
PVC-DRW-El Coyote-Op 50B-Str 106-Section, Edward Schortman
PVC-DRW-El Coyote-Op 50B-Str 106-Section, Edward Schortman
PVC-DRW-El Coyote-Op 50CA-Str 412-Section, Patricia Urban
PVC-DRW-El Coyote-Op 50F, O-Str 105-Excavation Unit Plan, David Aguilar
PVC-DRW-El Coyote-Op 50F-Str 105-Section, Patricia Urban
PVC-DRW-El Coyote-Op 50-Str 104-Excavation Sketch Plan, Edward Schortman
PVC-DRW-El Coyote-Op 50-Str 104-Section, Patricia Urban
PVC-DRW-El Coyote-Op 50-Str 104-Section, Patricia Urban
PVC-DRW-El Coyote-Op 50-Str 104-Section, Patricia Urban
PVC-DRW-El Coyote-Op 50-Str 104-Section, Patricia Urban
PVC-DRW-El Coyote-Op 50-Str 104-Sketch Plan, Leigh Anne Ellison
PVC-DRW-El Coyote-Op 50X-Str 106-Burial Plan, Edward Schortman
PVC-DRW-El Coyote-Op 52AA, AB, AC, AD, AF, AG, AH-Str 301, 402-Excavation Unit Plan, Andrew Haas
PVC-DRW-El Coyote-Op, 52AA, AC, AH-Section, Andrew Haas
PVC-DRW-El Coyote-Op 52AA, AC, AH-Str 301, 304-Schematic Section, Andrew Haas
PVC-DRW-El Coyote-Op 52AA, AC, AH-Str 301, 304-Sections, Andrew Haas
PVC-DRW-El Coyote-Op 52AA, AC, AH-Str 301, 304-Sections, Edward Schortman
PVC-DRW-El Coyote-Op 52AA, AD, AG, AH-Str 301-Excavation Unit Plan, Andrew Haas
PVC-DRW-El Coyote-Op 52AA-Str 301-Schematic Section, Andrew Haas
PVC-DRW-El Coyote-Op 52AA-Str 301-Section, Andrew Haas
PVC-DRW-El Coyote-Op 52AA-Str 301-Section, Andrew Haas
PVC-DRW-El Coyote-Op 52AA-Str 301-Section, Andrew Haas
PVC-DRW-El Coyote-Op 52AB, AF-Str 402-Excavation Unit Plan, Andrew Haas
PVC-DRW-El Coyote-Op 52AB-Str 402-Section, Andrew Haas
PVC-DRW-El Coyote-Op 52AB-Str 402-Section, Patricia Urban
PVC-DRW-El Coyote-Op 52AB-Str 402-Section, Patricia Urban
PVC-DRW-El Coyote-Op 52AE, AI, AJ-Str 302, 302A, 303-407-Excavation Unit Plans, Andrew Haas
PVC-DRW-El Coyote-Op 52AE, AI, AJ-Str 302, 303, 407-Excavation Unit Plan, Andrew Haas
PVC-DRW-El Coyote-Op 52AE-Str 302-Detailed Excavation Plan, David Aguilar
PVC-DRW-El Coyote-Op 52AE-Str 302-Excavation Plan, David Aguilar
PVC-DRW-El Coyote-Op 52AI-Str 407-Section, Andrew Haas
PVC-DRW-El Coyote-Op 52AJ-Str 302A, 303-Section, Andrew Haas
PVC-DRW-El Coyote-Op 52-Str 301, 302, 302A, 303, 304, 402, 407-Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 52-Str 301, 302, 302A, 303, 304, 402, 407-Excavation Sketch Plan, Andrew Haas
PVC-DRW-El Coyote-Op 52-Strs 301, 302, 303, 304, 402-407-Excavation Plans, Edward Schortman
PVC-DRW-El Coyote-Op 52-Strs 301, 302, 303, 304, 402, 407-Sketch Plan, Andrew Haas
PVC-DRW-El Coyote-Op 52-Strs 302A, 303-Section, Andrew Haas
PVC-DRW-El Coyote-Op 53 54-Strs 364, 368, 369, 372-Map, Edward Schortman
PVC-DRW-El Coyote-Op 53AB, AD, AF, AG, AM, BJ-Str 373-Excavation Unit Plan, Claire Novotny
PVC-DRW-El Coyote-Op 53AB, AD-Str 373-Section, Patricia Urban