Drawings are scale renderings of relations among soils, artifacts, features, and architecture revealed in excavations or as seen on modern ground surface. The primary kinds of drawings found in the collection are:
Sections: Depictions of cuts made through buildings or series of earth layers during excavations that show the horizontal and vertical relations among strata, constructions, and features. These are usually drawn at a scale of 1cm:20cm.
Elevations: Face-on renderings of architectural elements, primarily walls, showing the horizontal and vertical relations among their components, usually rocks. These are drawn at scales of 1cm:10cm and 1cm:20cm; check the drawings to see what scale is used in each case.
Excavation Plans: Top-down views of architectural elements revealed in excavations in which the constructions are depicted schematically, i.e., as lines. These drawings demonstrate the horizontal relations among constructions and features. They are drawn at a scale of 1cm:100cm. These are also called Excavation Maps.
Detailed Architectural Plans: Top-down views of architectural elements exposed in excavations, showing the horizontal relations among individual rocks comprising distinct construction units. They are drawn at a scale of 1cm:10cm.
Detailed Feature Plans: Top-down views of relations among materials revealed in excavations, drawn at a scale of 1cm:10cm. They are frequently depictions of burials and in situ artifact scatters.
Site Maps: Top-down renderings showing the horizontal relations among buildings and features at a site as these appeared on ground surface, that is, without excavations. Maps are drawn at scales of 1cm:1000cm or 1cm:500cm; check the drawing to determine which scale was used in each case. Site maps were not modified to include elements revealed during excavations.
Sketch Plans: These are not drawn to scale but are intended to show relations among such elements as architectural features, Suboperations, and excavation units and lots. A particular subset of this genre is the Excavation Unit Plan that shows the horizontal relations among the (usually) 1m2 pits that comprise the Suboperations dug at a particular locale.
Drawings
PVC-DRW-El Coyote-Op 14A, C-Str 11-Excavation Sketch Plan, Lauren Schwartz
PVC-DRW-El Coyote-Op 15A, B, E, F, I-Str 54-Excavation Sketch Plan, Edward Schortman
PVC-DRW-El Coyote-Op 15A, B-Str 54-Section, Edward Schortman
PVC-DRW-El Coyote-Op 15C, D, G, H-Str 57-Excavation Sketch Plan, Edward Schortman
PVC-DRW-El Coyote--Op 15C, D, G, H-Str 57-Excavation Unit Plan, Lauren Schwartz
PVC-DRW-El Coyote-Op 15C, D, G, H-Str 57-Excavation Unit Plan, Lauren Schwartz
PVC-DRW-El Coyote-Op 15C, D, G, H-Str 57-Excavation Unit Plan, Lauren Schwartz
PVC-DRW-El Coyote-Op 15C, D, G, H-Str 57-Schematic Section, Lauren Schwartz
PVC-DRW-El Coyote-Op 15C, D, G, H-Str 57-Section, Edward Schortman
PVC-DRW-El Coyote-Op 15J, K, L, M, N-Str 55-Excavation Sketch Plan, Russell Smith
PVC-DRW-El Coyote-Op 15J, K, L, M, N-Str 55-Excavation Sketch Plan, Russell Smith
PVC-DRW-El Coyote-Op 15J, K, L, M, N-Str 55-Excavation Unit Plan, Russell Smith
PVC-DRW-El Coyote-Op 15J-Str 55-Section, Edward Schortman
PVC-DRW-El Coyote- Op 15-Str 54-Section, Edward Schortman
PVC-DRW-El Coyote-Op 16AA-Str 68-Section, Edward Schortman
PVC-DRW-El Coyote-Op 16A, B, C, D, E, F, G, H, I J, K-Str 70-Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 16A, B, C, D, E, F, G, H, I J, K-Str 70-Excavation Unit Plan, Marcela Esqueda
PVC-DRW-El Coyote-Op 16A, B-Str 70-Schematic Section, Marcela Esqueda
PVC-DRW-El Coyote-Op 16A, B-Str 70-Schematic Section, Marcela Esqueda
PVC-DRW-El Coyote-Op 16A, B-Str 70-Section, Edward Schortman
PVC-DRW-El Coyote-Op 16G-Str 70-Burial Plan, Edward Schortman
PVC-DRW-El Coyote-Op 16H-Str 70-Schematic Section,, Marcela Esqueda
PVC-DRW-El Coyote-Op 16H-Str 70-Section, Edward Schortman
PVC-DRW-El Coyote-Op 16J-Str 70-Schematic Section, Marcela Esqueda
PVC-DRW-El Coyote-Op 16J-Str 70-Section, Edward Schortman
PVC-DRW-El Coyote-Op 16-Str 68-Elevation, Edward Schortman
PVC-DRW-El Coyote-Op 16-Str 68-Section, Edward Schortman
PVC-DRW-El Coyote-Op 16-Str 70-Elevation, Edward Schortman
PVC-DRW-El Coyote-Op 16-Str 70-Section, Edward Schortman
PVC-DRW-El Coyote-Op 18A, C, D-Str 94-SDection, Patricia Urban
PVC-DRW-El Coyote-Op 18A, C, D-Str 94-Section, Patricia Urban
PVC-DRW-El Coyote-Op 18A, C, D-Str 94-Section, Patricia Urban
PVC-DRW-El Coyote-Op 18B-Str 94-Section, Patricia Urban
PVC-DRW-El Coyote-Op 18B, V, AC-Str 94-Excavation Unit Plan, Meghan Kerley
PVC-DRW-El Coyote-Op 18C, M, P, Q, AA-Str 94-Excavation Sketch Plan of the Summit, Meghan Kerley
PVC-DRW-El Coyote-Op 18C, M, P, Q, AA-Str 94-Sketch Plan, Meghan Kerley
PVC-DRW-El Coyote-Op 18D-Str 94-Section, Patricia Urban
PVC-DRW-El Coyote-Op 18E, I, J-Str 95-Excavation Unit Plan, Charles Webber
PVC-DRW-El Coyote-Op 18E, I, J-Str 95-Sketch Plan, Charles Webber
PVC-DRW-El Coyote-Op 18E-Str 95-Section, Patricia Urban
PVC-DRW-El Coyote-Op 18E-Str 95-Section, Patricia Urban
PVC-DRW-El Coyote-Op 18F, H, X-Str 95-Excavation Unit Plan, Charles Webber
PVC-DRW-El Coyote-Op 18G, N, O, Y, AB-Str 96-Excavation Sketch Plan, Patrick Dresch
PVC-DRW-El Coyote-Op 18G, N, O, Y, AB-Str 96-Excavation Sketch Plan, Edward Schortman
PVC-DRW-El Coyote-Op 18-Str 94, 95, 96, 94-Sub1-Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 18-Str 94-Section, Patricia Urban
PVC-DRW-El Coyote-Op 18-Str 95-Section, Edward Schortman
PVC-DRW-El Coyote-Op 18-Str 95-Section, Edward Schortman
PVC-DRW-El Coyote-Op 18-Str 95-Section, Edward Schortman
PVC-DRW-El Coyote-Op 18-Str 96-Section, Patricia Urban
PVC-DRW-El Coyote-Op18-Str 96-Section, Paaricia Urban
PVC-DRW-El Coyote-OP 19, 50-Str 97, 98, 101, 305, 351, 104, 105, 106-Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 19 and 50-Str 97, 98, 101, 105, 106, 305, 351-Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 19 and 50-Str 97, 98, 101, 105, 106, 305, 351-Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 19A-Str 98-Section, Edward Schortman
PVC-DRW-El Coyote-Op 19A-Str 98-Section, Edward Schortman
PVC-DRW-El Coyote-Op 19B, M, N, S, W-Str 305-Excavation Sketch Plan, Mara Bernstein
PVC-DRW-El Coyote-Op 19B-Str 305-Section, Edward Schortman
PVC-DRW-El Coyote-Op 19C, I, R-Str 351-Excavation Sketch Plan, Brandon Liverence
PVC-DRW-El Coyote-Op 19C-Str 351-Schematic Section, Brandon Liverence
PVC-DRW-El Coyote-Op 19C-Str 351-Section, Edward Schortman
PVC-DRW-El Coyote-Op 19D, P, U, AA, AD, AE, AF, AN, AO, AP-Str 97-Excavation Unit Plan, Nicholas Hearth
PVC-DRW-El Coyote-Op 19D, P, U, AA, AD-Str 97-Excavation Sketch Plan, Nicholas Hearth
PVC-DRW-El Coyote-Op19E, F-Str 101-Section, Edward Schortman
PVC-DRW-El Coyote-Op19E, H, K, L-Str 101-Excavation Unit Plan, Kassia Randzio
PVC-DRW-El Coyote-Op 19F, J, N, Q, V, X, AB, AG, AJ, AK-Str 101-Excavation Unit Plan, Liesel Kuhr
PVC-DRW-El Coyote-Op 19-Str 101-Excavation Plan, Liesel Kuhr
PVC-DRW-El Coyote-Op 19-Str 101-Excavation Sketch Plan, Liesel Kuhr
PVC-DRW-El Coyote-Op 19-Str 97-Section, Edward Schortman
PVC-DRW-El Coyote-Op 19-Str 97-Section, Edward Schortman
PVC-DRW-El Coyote-Op 20AA, AB-Str 75-Section, Edward Schortman
PVC-DRW-El Coyote-Op 20A, B, C, D-Str 73, 82, 111-Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 20A-Str 82-Elevation, Edward Schortman
PVC-DRW-El Coyote-Op 20A-Str 82-Section, Edward Schortman
PVC-DRW-El Coyote-Op 20A-Str 82-Section, Edward Schortman
PVC-DRW-El Coyote-Op 20A-Str 82-Section, Edward Schortman
PVC-DRW-El Coyote-Op 20B-Str 73-Section, Edward Schortman
PVC-DRW-El Coyote-Op 20B-Str 73-Section, Edward Schortman
PVC-DRW-El Coyote-Op 20B-Str 73-Section, Edward Schortman
PVC-DRW-El Coyote-Op 20C-Str 73-Section, Edward Schortman
PVC-DRW-El Coyote-Op 20C-Str 73-Section, Edward Schortman
PVC-DRW-El Coyote-Op 20D-Str 111-Section, Edward Schortman
PVC-DRW-El Coyote-Op 23AA, AB, AC, AD, AE, AF-Str 128-Excavation Plan, Edward Schortman
PVCDRW-El Coyote-Op 23AE-Str 128-Section, Edward Schortman
PVC-DRW-El Coyote-Op 23-Str 128-Section, Edward Schortman
PVC-DRW-El Coyote-Op 24J-Test Pit-Section, Christian Wells
PVC-DRW-El Coyote-Op 24L-Str 124-Excavation Plan, Christian Wells
PVC-DRW-El Coyote-Op 24L-Str 124-Feasture Plan, Christian Wells
PVC-DRW-El Coyote-Op 24L-Str 124-Section, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pit-Plan and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells