History of Research
The Four Valleys Archive consists of all records resulting from archaeological investigations conducted from 1983-2022 across 180km2 (ca. 70 miles2) within five distinct drainages in northwestern and western Honduras. These basins include: the Naco valley along the Chamelecon river; the lower Cacaulapa drainage, a tributary of the Chamelecon situated 9km southwest of the Naco Valley; the middle Chamelecon valley, linking the Naco and lower Cacaulapa valleys; the middle Ulua river basin ca. 40km south of the Naco valley; and, the El Paraíso valley lying 93 km to the southwest of Naco and 27 km northeast of the lowland Maya center of Copan. The materials recorded in the course of this work span three millennia (1200BC-AD1532). The archive contains data pertaining to the configurations, sizes, and locations of more than 900 sites recorded on survey along with the results of excavations at over 180 settlements and the analysis of roughly one million artifacts.
Types of Data
Analysis Sheets | Catalog Sheets | Drawings |
Excavation Reports | Field Notes | Lot Cards |
Ulua Lot Cards | Photographs | Readouts |
Season Reports | Survey Reports | Theses |
See our guide for more ways to navigate the collection.
Scholarship
Posters |
Drawings
PVC-DRW-El Coyote-Op 19C-Str 351-Schematic Section, Brandon Liverence
PVC-DRW-El Coyote-Op 19C-Str 351-Section, Edward Schortman
PVC-DRW-El Coyote-Op 19D, P, U, AA, AD, AE, AF, AN, AO, AP-Str 97-Excavation Unit Plan, Nicholas Hearth
PVC-DRW-El Coyote-Op 19D, P, U, AA, AD-Str 97-Excavation Sketch Plan, Nicholas Hearth
PVC-DRW-El Coyote-Op19E, F-Str 101-Section, Edward Schortman
PVC-DRW-El Coyote-Op19E, H, K, L-Str 101-Excavation Unit Plan, Kassia Randzio
PVC-DRW-El Coyote-Op 19F, J, N, Q, V, X, AB, AG, AJ, AK-Str 101-Excavation Unit Plan, Liesel Kuhr
PVC-DRW-El Coyote-Op 19-Str 101-Excavation Plan, Liesel Kuhr
PVC-DRW-El Coyote-Op 19-Str 101-Excavation Sketch Plan, Liesel Kuhr
PVC-DRW-El Coyote-Op 19-Str 97-Section, Edward Schortman
PVC-DRW-El Coyote-Op 19-Str 97-Section, Edward Schortman
PVC-DRW-El Coyote-Op 20AA, AB-Str 75-Section, Edward Schortman
PVC-DRW-El Coyote-Op 20A, B, C, D-Str 73, 82, 111-Excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 20A-Str 82-Elevation, Edward Schortman
PVC-DRW-El Coyote-Op 20A-Str 82-Section, Edward Schortman
PVC-DRW-El Coyote-Op 20A-Str 82-Section, Edward Schortman
PVC-DRW-El Coyote-Op 20A-Str 82-Section, Edward Schortman
PVC-DRW-El Coyote-Op 20B-Str 73-Section, Edward Schortman
PVC-DRW-El Coyote-Op 20B-Str 73-Section, Edward Schortman
PVC-DRW-El Coyote-Op 20B-Str 73-Section, Edward Schortman
PVC-DRW-El Coyote-Op 20C-Str 73-Section, Edward Schortman
PVC-DRW-El Coyote-Op 20C-Str 73-Section, Edward Schortman
PVC-DRW-El Coyote-Op 20D-Str 111-Section, Edward Schortman
PVC-DRW-El Coyote-Op 23AA, AB, AC, AD, AE, AF-Str 128-Excavation Plan, Edward Schortman
PVCDRW-El Coyote-Op 23AE-Str 128-Section, Edward Schortman
PVC-DRW-El Coyote-Op 23-Str 128-Section, Edward Schortman
PVC-DRW-El Coyote-Op 24J-Test Pit-Section, Christian Wells
PVC-DRW-El Coyote-Op 24L-Str 124-Excavation Plan, Christian Wells
PVC-DRW-El Coyote-Op 24L-Str 124-Feasture Plan, Christian Wells
PVC-DRW-El Coyote-Op 24L-Str 124-Section, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pit-Plan and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Plans and Sections, Christian Wells
PVC-DRW-El Coyote-Op 24-Test Pits-Sections, Christian Wells
PVC-DRW-El Coyote-Op 25A-Test Pit-Excavation Plan, Christian Wells
PVC-DRW-El Coyote-Op 25A-Test Pit-Section, Christian Wells
PVC-DRW-El Coyote-Op 26A, B-Str 138-Excavation Plan, Christian Wells
PVC-DRW-El Coyote-Op 26A-Test Pits-Excavation Plan, Christian Wells
PVC-DRW-El Coyote-Op 26A-Test Pits-Section, Christian Wells
PVC-DRW-El Coyote-Op 26B Op 28A-Test Pits-Section, Christian Wells
PVC=DRW-El Coyote-Op 26B-Str 138-Burial Plan, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 138-Burial Plan, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 138-Burial Plan, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 138-Burial Plan, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 138-Burial Plan, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 138-Burial Plan, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 138-Burial Plan, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 138-Burial Plan, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 138-Elevation, Christian Wells
PVC-DRW-El Coyote-Op 26 B-Str 138-Excavation Plan, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 138-Section, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 138-Section, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 138-Section, Christian Wells
PVC-DRW-El Coyote-Op 26B-Str 238-Section, Christian Wells
PVC-DRW-El Coyote-Op 26B-Test Pits-Section, Christian Wells
PVC-DRW-El Coyote-Op 29A, B, C, D-Strs 161 and 163-Excavation Plan, William McFarlane
PVC-DRW-El Coyote-Op 29A, B, D-Str 163-Section, William McFarlane
PVC-DRW-El Coyote-Op 29AB-Str 156-Section, Georlin Thorne
PVC-DRW-El Coyote-Op 29AC-Str 165-Section, Patricia Urban
PVC-DRW-El Coyote-Op 29CB, CC, CD, CE, CF, CG, CH-Str 151-Excavation Unit Plan, Rebecca Laughner
PVC-DRW-El Coyote-Op 29CB-Str 151-Section, Rebecca Laughner
PVC-DRW-El Coyote-Op 29CB-Str 151-Section-Traced, Rebecca Laughner
PVC-DRW-El Coyote-Op 29CI, CJ, CK, Str 159-Excavation Unit Plan, Rebecca Laughner
PVC-DRW-El Coyote-Op 29CI-Str 159-Section, Rebecca Laughner
PVC-DRW-El Coyote-Op 29C-Str 161-Section, William McFarlane
PVC-DRW-El Coyote-Op 29-Str 151-Section, Rebecca Laughner
PVC-DRW-El Coyote-Op 29-Str 151-Section-Traced, Rebecca Laughner
PVC-DRW-El Coyote-Op 29-Str 151-Sketch Plan, Rebecca Laughner
PVC-DRW-El Coyote-Op 29-Str 151-Sketch Plan, Rebecca Laughner
PVC-DRW-El Coyote-Op 29-Str 156-Detailed Excavation Plan, Patricia Urban
PVC-DRW-El Coyote-Op 29-Str 156-Section, Georlin Thorne
PVC-DRW-El Coyote-Op 29-Str 159-Section, Rebecca Laughner
PVC-DRW-El Coyote-Op 29-Str 165-Section, Patricia Urban
PVC-DRW-El Coyote-Op 31A, B-Str 173-Section, Adam Taplin
PVC-DRW-El Coyote-Op 31G, H, Str 174-Section, Adam Taplin
PVC-DRW-El Coyote-Op 31-Strs 173, 174-excavation Plan, Edward Schortman
PVC-DRW-El Coyote-Op 36AA, AB, AC, AD, AE-Platform-Detailed Excavation Plan, Leigh Anne Ellison
PVC-DRW-El Coyote-Op 36AA-Platform-Section, Leigh Anne Ellison
PVC-DRW-El Coyote-Op 36A, B, C, D-Str 223 and 224-Section, William McFarlane
PVC-DRW-El Coyote-Op 36A, B, C, D-Str 223 and 224-Section, William McFarlane
PVC-DRW-El Coyote-Op 36A, B, C, D-Str 223 and 224-Section, William McFarlane
PVC-DRW-El Coyote-Op 36A, B, C, D-Str 223 and 224-Section, William McFarlane
PVC-DRW-El Coyote-Op 36A, B, C, D-Str 223 and 224-Section, William McFarlane
PVC-DRW-El Coyote-Op 36A, B-Str 224-Excavation Plan, William McFarlane
PVC-DRW-El Coyote-Op 36A-Str 224-Feature Plan, William McFarlane
PVC-DRW-El Coyote-Op 36A-Str 224-Feature Plan, William McFarlane
PVC-DRW-El Coyote-Op 36C-Str 223-Excavation Plan, William McFarlane
PVC-DRW-El Coyote-Op 36E-Str 224-Section, William McFarlane
PVC-DRW-El Coyote-Op 36E-Str 224-Section, William McFarlane