PVC-PHOTO-OP 14AA-Structure 13-Unit 20 on the right runs over Unit 19 and both are backed by Unit 15
Format
Photograph
Date Collected
2018
Recommended Citation
Schortman, Edward Mark, "PVC-PHOTO-OP 14AA-Structure 13-Unit 20 on the right runs over Unit 19 and both are backed by Unit 15" (2018). Photographs. Paper 418.
https://digital.kenyon.edu/hondurasphotos/418
Region
lower Cacaulapa valley
Operation
14
Suboperation
14AA
Lot
multiple
Project Number
1
Structure
13