Document Type

Article

Publication Date

2022

Comments

This document presents as a table that indicates which suboperations were dug by which excavators (given by their excavation numbers), in the course of investigating which buildings in the middle Ulua drainage (PSB Project). Please note that the Operations (2-13) devoted to investigations at the site of Gualjoquito appear at the end of the table.

COinS