Format
Season Report
Date Collected
2007
Region
lower Cacaulapa valley, middle Chamelecon valley
Operation
PVN 598, PVN 607, PVC 120, PVC 161, PVC 162
Suboperation
multiple
Lot
multiple
Project Number
5
Structure
multiple
Season Report
2007
lower Cacaulapa valley, middle Chamelecon valley
PVN 598, PVN 607, PVC 120, PVC 161, PVC 162
multiple
multiple
5
multiple
Comments
Summary of work conducted at rural Sites PVN 607 and PVN 598 in the midde Chamelecon and Sites PVC 120, PVC 161, and PVC 162 in the lower Cacaulapa valleys during the 2004 field season. A summary of research conducted in the copper processing area at the site of El Coyote is also included in this report.